Came back from Ubon yesterday so Just in case anyone is likely to be riding on any of these roads..............
Work continues at Denchai on route 11 junction, the traffic lights are working but not a lot else.
For a few KM south on the 11 the road is good but the road works take over with a bumpy surface in places and carriageway changes. That hill section is still a horrible mess. All road works finish by the junction with route 1105
Minor road works entering Uttradit by the first set of traffic lights with one (I think) carriagway change.
South of Uttradit (I wish I had marked it) on the north bound carriageway there was a minor bridge that has been covered in tarmac. This has been very badly (dangerously) rippled in the middle of the road. Enought to give me palpatations driving a Fortuner, bloody dangerous to any one on a bike. The rest of the road is excellent which makes this all the more dangerous to anyone on a bike. Watch out for the short, just a few metres, section of tarmac.
Approaching Khao Kho from the west there are some rough patches and holes appearing. God forbids it ends up like it was 20 years ago. The main west-east carriageway through Khao Kho itself is blocked off with diversions onto the frontage road. It looked like a big rip in the road surface.
In Nam Nao national park, 14km from the western entrance the east to west carriageway has completely disappeared down the hillside. They were working on this yesterday with traffic control (!!) This leaves a short section of bumpy mud road for a few 10's of metres. In the same area there were a couple of other gangs out clearing up minor landslides. These were very recent.
Road works continue west of Chum Pae and look like there will be for a long time. A number of carriageway changes and rough surfaces in various places. To a minor extent the same on the eastern side.
The road into Khon Kaen form the west has shown a marked deterioration since last I drove this road a few months ago. It isnt the nice smooth road it once was.
Road widening works on the northern side of the Yasathon bypass. The rest of it appears to be deteriorating in places as well.
Road widening works continue on the western approach to Ubon. This dual carriageway looks like it will be meeting up with the dual carriageway through Khueang Nai when they finish that bit.
If anyone is really interested in the 24 from Ubon to Det Udom, a fairly new wide road, pity its showing badly rippled edges and holes already. As for the road through Det Udom, it was bad the day day before they laid it and it hasnt improved any.
Work continues at Denchai on route 11 junction, the traffic lights are working but not a lot else.
For a few KM south on the 11 the road is good but the road works take over with a bumpy surface in places and carriageway changes. That hill section is still a horrible mess. All road works finish by the junction with route 1105
Minor road works entering Uttradit by the first set of traffic lights with one (I think) carriagway change.
South of Uttradit (I wish I had marked it) on the north bound carriageway there was a minor bridge that has been covered in tarmac. This has been very badly (dangerously) rippled in the middle of the road. Enought to give me palpatations driving a Fortuner, bloody dangerous to any one on a bike. The rest of the road is excellent which makes this all the more dangerous to anyone on a bike. Watch out for the short, just a few metres, section of tarmac.
Approaching Khao Kho from the west there are some rough patches and holes appearing. God forbids it ends up like it was 20 years ago. The main west-east carriageway through Khao Kho itself is blocked off with diversions onto the frontage road. It looked like a big rip in the road surface.
In Nam Nao national park, 14km from the western entrance the east to west carriageway has completely disappeared down the hillside. They were working on this yesterday with traffic control (!!) This leaves a short section of bumpy mud road for a few 10's of metres. In the same area there were a couple of other gangs out clearing up minor landslides. These were very recent.
Road works continue west of Chum Pae and look like there will be for a long time. A number of carriageway changes and rough surfaces in various places. To a minor extent the same on the eastern side.
The road into Khon Kaen form the west has shown a marked deterioration since last I drove this road a few months ago. It isnt the nice smooth road it once was.
Road widening works on the northern side of the Yasathon bypass. The rest of it appears to be deteriorating in places as well.
Road widening works continue on the western approach to Ubon. This dual carriageway looks like it will be meeting up with the dual carriageway through Khueang Nai when they finish that bit.
If anyone is really interested in the 24 from Ubon to Det Udom, a fairly new wide road, pity its showing badly rippled edges and holes already. As for the road through Det Udom, it was bad the day day before they laid it and it hasnt improved any.